Jump to content
TEST environment ×
TEST environment

Recommended Posts

Posted

If I am understanding your question correctly, the solution is simple:
Temporarily replace a tile that is under the 2x8 plate with a plate so there is a stud for connecting the 2x8 plate, then swap the temporary plate back to the requited tile after the 2x8 is in place.

As far as I know, Stud.io does not have mechanical connections that would allow for the rack gear assembly to actually slide in the software.

Temporary pieces to position final pieces are a common technique in Stud.io for atypical connections (lack of stud to anti-stud, bar, or Technic pin/axle in final assembly).

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...