Jump to content
THIS IS THE TEST SITE OF EUROBRICKS! ×
THIS IS THE TEST SITE OF EUROBRICKS!

Recommended Posts

Posted

Planet: B09

Tags: spaceship, science

Huge science space ship with was sent behind enemy frontline to perform important experiment of combining multiple remote energy sources.

Crew size: 51.

Military personnel: 6.

Total weight: 10.000 tons

Emitter max output 30MW/s.

Advance positioning system accuracy: 6mm/100km

Defense: not installed.

Spaceship bridge log entry: 30151215

Long Range Energy Transfer (LRET) experiment.

Time 14:35

23779237876_fd8ecf8d20.jpg

Story and more pics below:

Pilot: on the orbit.

23805335515_059ba7592d.jpg

CMO (Chief Mission Officer): Preparing systems and aligning ship.

Operator: All system ready.

23722896711_2bea93decb.jpg

s-555: on position:

23805346865_4c88701ebb.jpg

s-555: Waiting for long distance transfer

23178550663_3582ca33e8.jpg

Operator: incoming transmission.

s-058: Energy impulse detected. Expected to reach destination in 2 minutes 23 seconds.

CMO: Starting countdown 2 minutes 10 seconds. Go.

Operator: Countdown started.

Operator: Reactor check?

Reactor crew: Reactor 30%, go.

Operator: Power grid?

Reactor crew: Power grid are go.

Operator: s-555 status?

s-555: in position, and ready.

Operator: s-560 status?

s-560: communications are go.

Operator: APS?

APS crew: APS aligned, go.

Operator: Debris monitoring?

s-560: Debris monitoring are go.

CMO: All sections, activate magnetic correctors.

23779244416_fbcce5373e.jpg

Operator: Section 1 status?

Crew member: Section 1 are go.

Operator: Section 2 status?

Crew member: Section 2 are go.

Operator: Section 3 status?

Crew member: Section 3 are go.

Operator: Section 4 status?

Crew member: Section 4 are go.

Operator: Energy output to 60%

Reactor crew: energy set to 60%.

Operator: 24 seconds and counting.

23437391339_c0e6f704d2.jpg

Operator: 15 seconds. CMA status?

CMO: LRET go.

23509655320_7b292938c1.jpg

Operator: 8, 7, 6, 5, 4, 3, 2

Operator: Activate energy transfer, now.

23696915082_6e3146c674.jpg

s-555: channel 1 established. Receiving 12MW/s Expecting channel 2 is 4 seconds.

23805479495_57bd2238e5.jpg

s-555: Channel 2 established with 34MW/s. Combining energy sources. Done. Activating Pulse Impact Drill.

23779814046_aaa12502a9.jpg

s-555: Channel 2 closed.

23805351205_685e539bf2.jpg

CMO: stop LRET in 3,2,1 Stop now.

Operator: LRET off.

CMO: s-555 status

s-555: all systems are ok.

CMO: Hibernate all LRET systems.

Report to HQ that mission was successful.

yCMO: good job everyone!

Posted

Nice mini-builds! Since it was sent behind enemy lines, it kinda needs its defense installed pretty soon!

Indeed! and well officially these are just corporations and not military organisations...

That's not to say corporations don't have private armies fighting secret wars of course.

Posted

Indeed! and well officially these are just corporations and not military organisations...

That's not to say corporations don't have private armies fighting secret wars of course.

allegedly.....but who knows?

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...