Jump to content
THIS IS THE TEST SITE OF EUROBRICKS! ×
THIS IS THE TEST SITE OF EUROBRICKS!

Recommended Posts

Posted

[MOC] Wayne Manor + Batcave

PHASE 7 — Wayne Manor Construction Continues

Work continues on Wayne Manor. In other news, the amount of bricks and pieces on this MOC has required some new shelving and organization. There are a lot of black, yellow, grey, and blue pieces that have to be sorted and kept track of.

 

Fj9G8rv.jpg

 

  • 2 years later...
  • Replies 64
  • Created
  • Last Reply

Top Posters In This Topic

Posted

PHASE 8 — Wayne Manor Construction Restarted

After more than two years of no work the construction has restarted. Working in the second floor. Custom printed floor tiles in both the grand hall and side rooms.

IMG-0574.jpgIMG-0573.jpg

Posted

 

PHASE 8 — Wayne Manor Construction Restarted

The roof over the main dining room has been added to the back of Wayne Manor. The second floor grand hall and side rooms have been completed.

wm1.jpg

 

The front of the second floor of Wayne Manor has been completed. Windows for the grand hall and the side rooms are now all in place.

wm4.jpg

 

Wayne Manor would not be complete without some exotic warrior statues. There is a Samurai, Crusader Knight, and a Roman Centurion statue in the middle of the grand hall. LEGO King of the Wicker People statue is still under consideration.

 

wm2.jpg'

wm3.jpg

 

Posted

PHASE 8 — Wayne Manor Construction Restarted

The third floor has been completed along with the roof sections for the side rooms. Custom floor tiles are now in place.

Some experimentation with adding gargoyles (grotesques) on the exterior of Wayne Manor.

wm5.jpg

wm7.jpg

Posted

PHASE 8 — Wayne Manor Construction Restarted

The roof of Wayne Manor has been completed. Put the finishing touches on the front and rear-facing areas of the main building.

wm9.jpg

wm10.jpg

  • 1 month later...
Posted (edited)

PHASE 9 — Batcave Completion

The third level of the Batcave has now been completed. Includes an elevator entrance into Wayne Manor as well as the abandoned well entrance to the Batcave too.

IMG-0886.jpg

 

IMG-0882.jpgIMG-0913.jpg

Edited by MrWayne
Posted (edited)

PHASE 10 — Wayne Manor + Batcave is Done

A few years. A few thousand bricks. A lot of joy.

Wayne Manor sits atop three levels of the Batcave.

IMG-0943.jpg

IMG-0944.jpg

IMG-0945.jpg

IMG-0946.jpg

Edited by MrWayne

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.

Announcements

  • THIS IS THE TEST SITE OF EUROBRICKS!

×
×
  • Create New...